Halfway there!

I’m halfway through the Driftwood Tee that is my second TTTKAL project.  I’m loving working with this Manos Serena fiber.  I discovered I was a stitch short when I got to the shoulder shaping bind offs, and I have no idea where it went, but I continued forward and promptly put it out of my mind.  drift backI was happy to find that I had 14.4 grams leftover from the second ball, so I will only need 4 balls of this yarn for the top.  I’m not getting by on the skin of my teeth with crossed fingers for this project!  drift back-2

8 thoughts on “Halfway there!

  1. Wow, that was fast! I was considering this top as well so it is neat to see how you do with it. Looks great! I am such a slow knitter I never sign up for KALs since I will weeks or months finishing the project. 😦

  2. It is looking so good! Isn’t it wonderful to be confident enough as a knitter to put a missing stitch out of your mind?
    I’m also about halfway thru my tee for the KAL. That dk is slow going.

What do you think?

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s